400m3 pour in one day on the M4 Smart Motorway. One of many pours we have done on this project, delivering 23000M3 of ready mix from Junctions 3 to 12 to date.
400m3 pour
+6000m3 of ready mixed concrete for Midwest Formwork for a large commercial building. Adprufe 100 from Grace was used on this project.
Croxley Business Park, Watford- 6000m3
+15000m3 of ready mixed concrete for Modebest Builders.
Two blocks of Residential apartments incorporating Hydrocrete water tight concrete into the basements .
Crown Lane, Maidenhead – 15000m3
+25000m3 of ready mixed concrete for Ground Construction Ltd (GCL) for a Luxury residential apartment block
Warwick Road, Kensington – 25000m3
+10000m3 of ready mixed concrete delivered to Paddington for McAleer and Rushe for the construction of luxury canalside apartments.
Paddington – 10000m3
+27000m3 of ready mixed concrete for CJ O’Shea for a large shopping centre built on the Uxbridge Road in Acton. In this project we incorporated Sika water tight concrete into basement areas .
Acton Town Centre – 27000m3
+Wembley – 10000m3
+Delivery of 11000m3 of ready mixed concrete for Mitchellson. The commercial building now boasts 242,000 sq ft of office space with 11 floors. In this project we incorporated Everdure Caltite water tight concrete into the basement areas.
245 Hammersmith Road – 11000m3
+Lilys Walk, High Wycombe – 13000m3
+Delivery of 19000m3 of ready mixed concrete for Ardmore for the development of 600 student rooms and 85 PRS units within a series of buildings rising to 31-storeys incorporating Sika water tight concrete into the basement areas.
Wales Farm Road, Acton – 19000m3
+Approx 20000m3 of ready mixed concrete delivered to Keltbray Piling and Joseph Gallagher for the RC frame at Glenthorne Road Hammersmith for the construction of residential blocks consisting of 418 apartments. Lots of special mixes were used in the project, including Xypex water tight concrete into the basement areas and a C60/70 and C80/90 concrete for walls and columns.
We also hauled over 15000m3 of muck away from this job.
Sovereign Court, Hammersmith – 7000m3 & 13000m3
+45000m3 of ready mixed concrete delivered for Modebest Builders for the development of approximately 500 new apartments in Park Royal. This forms part of the Old Oak and Park Royal Development Corporation’s (OPDC) £26 billion regeneration plans to create a new district in west London. In this project we incorporated Hydrocele water tight concrete to basements and car parking areas.
Lakeside Drive, Park Royal – 45000m3
+800m3 of ready mixed concrete delivered for Keltbray. We supplied Heavy weight concrete to cover the large high voltage cabling and C32/40 with Novocon HE 1060 steel fibres .
Slough Power Station – 800m3
+Delivered To various housing projects within West London, Buckinghamshire, Berkshire, Surrey and Hampshire areas.